menu
VOC waste gas treatment in hazardous waste temporary storage
Scheme  introduction

The gas composition in the pit of solid waste and hazardous waste pretreatment workshop and incineration workshop is complex, which contains a large amount of acid gas and alkaline gas

Treatment process: in the first step, the washing deodorization process is adopted, which uses the characteristics of neutralization reaction and dissolution in water between the pollutants in the waste gas and the alkaline absorption solution. In the second step, the activated carbon adsorption method is adopted to effectively adsorb the organic waste gas insoluble in water, so as to achieve the purpose of deodorization. Regularly discharge the washing deodorization equipment to the sewage treatment system for treatment.

Main features of the equipment: the washing tower adopts acid / alkali washing and water washing integrated tower + activated carbon adsorption for waste gas purification treatment, automatic control, up to standard discharge, small floor area, simple and convenient control operation, good treatment effect and low maintenance cost.




applicationcase

光大(连云港).jpg

Everbright (Lianyungang)

光大(黄石) (2).jpg

Everbright (Huangshi)

4e577afd696d5ea2a346d2eca90f6b5.jpg

Suez

021e49eaeb54861bcf002dc84645cc1.jpg

Suez

54551616eb642e250c2114354cee1e0.jpg

Suez

宜昌七朵云.jpg

Seven clouds in Yichang

光大(临沭).jpg

Everbright (Linshu)

光大(盐城).jpg

Everbright (Yancheng)